With the aim of extending the original 400,000 m3/d Linjiang Drinking Water production as well as increasing the produced water quality, Veolia China Municipal was awarded a double objective project: design, build and commissioning of a new 200,000 m3/d traditional treatment line and extension of the deep treatment upgrading the 400,000 m3/d existing lines. The total final capacity of the Plant is 600,000 m3/d.

The processes are ozone, ACTIFLO®, TGV filters, GAC filters, UV, chlorine and ammonia are used in this project.
When the work completed, the Linjiang Drinking Water Plant will produce water of the highest quality in China, possibly in Asia and the World.